1 |
S&T work involving trenching,
cable lying, termination of acble
with its accessories, fixing of track
devices of axle counter, casting of
foundation, erection of location
boxes, wiring, installation and
commissioning of axle counter &
BPAC with its power supply
arrangements in connection with
seperate track devices etc.
CA No. SW-Sig/UMB/OT-46/09-
2010 DT 09.12.2010 |
Northern
Railway
Ambala Cantt |
SW-Sig/UMB/OT-46/09-
2010 DT 31-08-2010 |
22.04.2015 |
3,08,08,579.00 |
|
2 |
Signalling work involving
trenching, cable lying, termination
of cable with its accessories, fixing
of track devices of axle counter,
casting of foundations, erections of
location boxes, wiring, installation
& commissioning of axle counter
with its power supply arrangement
in connection with Relocation of
signals in SDY-SIR section
CA No. SW-Sig/UMB/2011-12/OT
- 08 DT 29-09.2011 |
Northern
Railway
Ambala Cantt |
SW-Sig/UMB/2011-12/OT
- 08 DT 29-08-2011 |
31.08.2013 |
82,45,878.00 |
|
3 |
Provision of Signalling work in c/w
installation and commissioning of
SSDAC for redundancy over Delhi
Division. CA No.558-
Sig/16M/Tender/1145-W DT -
05.10.2012 |
Northern
Railway
New Delhi |
558-Sig/16M/Tender/1145-
W DT - 05.10.2012 |
15.05.2017 |
1,04,78,790.30 |
|
4 |
Signalling work involving
trenching, cable laying, casting of
foundations & errection of location
boxes in connection with (i)
Provision of modified automatic
signalling in UMB-RPJ-SIR section
(ii) Const. of light overhead
structure at km268/24-26 on UMBLDH
section at UBC of Ambala.
(iii) Replacement of Batteries of
IPS sations at 15 stations over
Ambala Division. (iv) Digital Axle
counter in place of track circuiting
having low ballast resistance at
UMB, SRE,CDG & RPJ stations.
CA No. SW-Sig/UMB/OT-
43/2011-12 DT 19-10-2012 |
Northern Railway Ambala Cantt |
SW-Sig/UMB/OT-43/2011-
12 DT 19-10-2012 |
20.05.2017 |
1,72,41,186.00 |
|
5 |
Indoor signalling work in c/w
provision of central panel for
operation of points & signals in
connection with railway facilities
for Cement plant of ACL at
Bsthinds
CA No.SW/SIG/UMB/OT-
07/2012-13 DT.21.01.2013 |
Northern Railway Ambala Cantt |
SW/SIG/UMB/OT-07/2012-13 DT.21.01.2013 |
18.11.2016 |
1,80,05,171.00 |
|
6 |
Signallng work in connection with
shifting/Re-location of utilities as
existing S&T installation are
required to be made RE fit in
connection with electrification of
DFC track over western freight
corridor in RPC and FL-MD section
in Jp division. (Block & Earthing
Work) CA
No.SG/32/5/09/14-15 Dt:
04.11.2014 |
JAIPUR
/NORTH
WESTERN
RAILWAY |
SG/32/5/09/14-15 Dt:
28.08.2014 |
02.12.2017 |
97,18,516.00 |
|
7 |
Supply, Installation, Testing &
Commissioning of Block Proving
of Digital axel Counter in
idgah(IDH) - Bharatpur(BTE) &
Mathura Jn. (MTJ)- Achnera Jn.
(AH) Sections of Agra Division
connection with Railway
Electrification.
CA No. AGRA/S&T/135 Dt.
19.01.2017 |
AGRA CANTT/
NORTH
CENTRAL
RAILWAY |
AGRA/N/Wks/MSDAC/ID
H-BTE-Sec Dt. 03.08.2016 |
26.03.2018 |
1,32,01,082.41 |
|
8 |
Provision of Dual detection system
for redundancy and media diversity
for working block proving axle
counter (BPAC) on Jaipur-Sawai
Madhopur & Madar 0 Jaipur
Bandikui - Rewari sections ("B"
Route) of Jaipur Division (For JP -
SWM Section). CA
No.SG/32/5/29/15-16 DT.
18.01.2016 |
JAIPUR
/NORTH
WESTERN
RAILWAY |
SG/32/5/29/15-16 DT.
30.11.2015 |
27.03.2017 |
2,65,45,576.00 |
|
9 |
Provision of Block proving by
Digital Axle counter using
Universal Fail-Safe Block Interface
(UFSBI) in Ajmer – Udaipur
section of N.W. Railway in
connection with 25 KV AC
tractionCA No.
.CPD/S&T/RE/JP/100/SIG/(UFSBI
AII-UDZ) Dated:27.12.2017 |
RE/JAIPUR/
NORTH
WESTERN
RAILWAY |
CPD/S&T/RE/JP/100/SIG/(
UFSBI AII-UDZ) Dated:
14.06.2017 |
17.04.2019 |
2,69,73,748.55 |
|
10 |
“S&T works for provision of PI at
Katar Singhwala & Block cabin ‘C’
stations in Kotfateh - Bhatinda
section in c/w doubling alongwith
associated works at adjoining
stations/sections over Delhi division
of Northern Railway”. CA No. 178-
SIG/CW/32/47 Dated : 22.09.2015 |
Dy
CSTE/C/CW/NO
RTHERN
RAILWAY |
178-SIG/CW/32/47 Dated :
22.09.2015 |
14.08.2019 |
3,78,46,848.59 |
|
11 |
S&T work involving trenching,
cable lying, casting of foundation of
location boxes and erection of
location boxes, part supply of
material in connection with (I)
Provision of completed track
circuiting at patiala , Dhuri, Raipur
Haryana, Bathinda Cannt &
Roopnagar stations. (II) Manning of
Unmanned Level crossing gate in
SIR-NLDM Section. CA No. SW
SIG/UMB/OT-36/2009-10 Dated.
08.04.2010 |
Northern Railway Ambala Cantt |
SW SIG/UMB/OT-
36/2009-10 Dated.
12.03.2010 |
25.06.2018 |
2,82,45,838.00 |
|
12 |
Provision of HASSDAC at 7
locations by replacing old Analog
Axle counter in Dhanbad Division
& Provision of Class 'A' at lighting
prone stations (13 Nos.) of GC
Section to protect indoor signalling
installations in Dhanbad Division.
CA No. SG-664-11-SIG-2017-18
DATED 22.03.2018 |
DSTE/EAST
CENTRAL
RAILWAY
/DANBAD |
SG-664-11-SIG-2017-18
DATED 22.03.2018 |
21.03.2019 |
47,95,661.60 |
|
13 |
Jaju-Bhandai: Reliability
improvement of IBS working with
provision of IBS on OFC along
with signalling safety
programmable controller system
CA No.AGRA-ST-2017-29
DATED 21.03.2018 |
Sr.
DSTE/SIGNAL/
NCR/AGRA |
LOA NO.
AGRA/N/WKS/JJBHA/
IBS/OFC DATED
20.12.2017 |
25.05.2019 |
87,64,968.75 |
|
14 |
Supply, Installation, Testing &
Commissioning of block proving of
digital axle counter in Idgah(IDH) -
Bandikui(BKI)section of Agra
Division CA No.AGRA/S&T/146
DATED -29/06/2017 |
Sr.
DSTE/WORKS/
AGRA |
LOA NO.
AGRA/N/WKS/BLOCK
PANELS/IDH-BKI/SEC
DATED -29/06/2017 |
29.12.2022 |
4,81,58,450.67 |
|
15 |
Agra Division: Elimination of
Token less Block Instruments with
block panel in MTJ - AWRsection
of Agra division CA NO. AGRAST-
2018-09 DATED 24.04.2018 |
DSTE/WORKS/
AGRA |
LOA NO.
AGRA/N/WKS/BLOCK
PANELS/MTJ-AWR
DATED 24.04.2018 |
11.12.2019 |
2,12,40,894.53 |
|
16 |
Provision of UFSBI with
HASSDAC in lieu of Block proving
by axle counter in Luni-Samdari-
Munabao section of Jodhpur
division of NW Railway. (21 block
station ) CA No.S&T
/JU/PROJECT/03/2017-18,
DATED 19.02.2018 |
DyCSTE/PROJE
CT/JODHPUR |
S&T
/JU/PROJECT/03/2017-18,
DATED 29.12.2017 |
26.08.2019 |
4,97,80,424.00 |
|
17 |
Bhopal Division: Improvement of
Reliability of 03 IBHs by
redundancy of communication
media in BINA-KIKA, BAQ-PAI
& ODG-BKA sections in Bhopal
Division. CA
No.BPL/N/WKS/2017-18/Sig/15
Dt 08.03.2018 |
Sr.
DSTE/WORKS/
BHOPAL |
LOA No.
BPL/N/WKS/2017-
18/Sig/15 Dt 08.01.2018 |
27.06.2019 |
91,48,226.51 |
|
18 |
Provision of HASSDAC in lieu of
SSDAC with auto resetting
arrangement in AII-CNA section
over AJMER division -NWR CA
No. S&T/AII/31/2017-18 Date
07.06.2018 |
Sr.
DSTE/NWR/AJ
MER |
LOA No.
WA/SG/217/2/219 Date
12.03.2018 |
04.02.2020 |
2,83,38,616.00 |
|
19 |
Mahoba-Khajuraho, Lalitpur-
Khajuraho & Bhind-Udi - Repl. of
Neale's ball token instrument with
block panel.(7 block sections). CA
No.JHS/S&T/WKS/2018/07/REPL.
NEALE'S BALL TOKEN-07
DATED25.02.2018 |
DSTE/NCR/JHS |
JHS/S&T/WKS/2018/07/R
EPL. NEALE'S BALL
TOKEN-07
DATED.07.12.2018 |
31.01.2021 |
2,43,50,085.00 |
|
20 |
Provision of HASSDAC in lieu of
SSDAC with auto resetting
arrangement in COR-UDZ section
over Ajmer Division- NWR CA
No.S&T/AII/30/2017-18 Date
07.06.2018 |
Sr.
DSTE/NWR/AJ
MER |
WA/SG/217/2/220 Dt 12-
03-2018 |
10.02.2021 |
1,33,02,290.00 |
|
21 |
Provision of redundancy of OFC
media over quad cable for Block
providing mux JHS-BINA section. |
DSTE/JHS/NCR |
JHS-SNT-Wks-2017-
18OFC-JHS-BINA Dated
25.05.2018 |
15.04.2021 |
45,94,913.89 |
|
22 |
Signalling Work involving
trenching and cable lying, cating of
foundation, termination of cable
witj accessories in c/w (i) Manning
of unmanned L-Xing Gates (ii)
Provision of GI Trough at Girder
bridges, culverts over Ambala
Division. |
DSTE/NR/AMB
ALA CANTT |
LOA No. SWSIG/
UMB/2010-11/OT-12
Dated 12.05.2011 |
129.11.2020 |
92,47,105.00 |
|
23 |
Provision of UFSBI block
instrument in place of Token block
instrument bet NBD to KTW ,
BLM-ON & BLM - SPC section of
MB Division. |
DSTE/NR/MOR
ADABAD |
LOA No. 04/S&T/SIG/MB/
2016-17 Dated 02.03.2017 |
20.12.2021 |
2,22,99,852.00 |
|
24 |
Supply and execution of signalling
items in connection with various
track work in ADSTE/Bina-Guna
section of Bhopal division over
West Central Railway. CA No.
04/S&T/SIG/MB/ 2016-17 Dated
02.03.2017 |
Sr.
DSTE/WORKS/
BHOPAL |
LOA No.
BPL/N/WKS/2017-
18/Sig/07 Dt. 22.11.2017 |
30.03.2021 |
2,18,13,487.65 |
|
25 |
Allahabad Division: Provision of
SSBPAC in Link Jn. - Lohgara
section.CA No.ALD-Sig-78-2017-
18 Dated 16.08.2018 |
Sr.
DSTE/WORKS/
NCR
/ALLAHABAD |
LOA No. ALD-Sig-78-
2017-18 Dated 16.08.2018 |
120.09.2021 |
1,33,02,290.00 |
|
26 |
Provision of additional safety and
reliability aids on different stations
over Lucknow Division. CA
No.LOA No. N/16/2017/OT/27 Dt -
16.08.2018 |
Sr.
DSTE/NER/LJN |
LOA No. N/16/2017/OT/27
Dt - 29-05-2018 |
31.08.2020 |
1,54,86,201.00 |
|
27 |
Provision of additional safety and
reliability aids in BSB Division,
N.E. Railway. LOA No.
N/539/2/OT/17-18/45 DATED
120.09.2018 |
Sr. DSTE/BSB |
LOA No. N/539/2/OT/17-
18/45 DATED 13.06.2018 |
31.10.2022 |
1,62,39,903.44 |
|
28 |
AGC-DHO: Reliability
Improvement of Signalling Gears of
old Intermediate Block Signaling
(04 IBS). CA No.AGRA-ST-2018-
21 DATED.14.12.2018 |
DSTE/NCR/AG
RA |
LOA No.
AGRA/N/WKS/04
IBS/AGC-DHO
DATED.26.09.2018 |
30.10.2021 |
4,58,10,525.97 |
|
29 |
S&T work (Indoor & Outdoor) for
provision of Centralised Electronic
Interlocking at Khasa station
alongwith block working and
associated telecom work at adjacent
stations i.c.w. development of
Khasa as freight terminal in
Ferozpur Division of Northern
Railway". CA No.178-SIG-CW-32-
84 DATED26.11.2019 |
Dy CSTE/C/CW |
LOA NO. CAO-C-NR- S
AND T/178-SIG-CW-32-
84/00900840004894
DATED13.08.2019 |
13.07.2020 |
3,39,82,926.16 |
|
30 |
Redundancy to old aged axle
counter for reliability improvement
of IBH in KTRA- JHS section over
Jhansi division. CA
No.JHS/N/W/12/18/ AXLE
COUNTER/KTRA/JHS
DATED.01.03.2019 |
Sr.
DSTE/ML/JHS |
LOA No. JHS/N/W/12/18/
AXLE
COUNTER/KTRA/JHS
DATED.24.07.2018 |
31.12.2021 |
1,62,18,353.15 |
|
31 |
Reliability of signalling gears for
the equipment Axle counter, UFSBI
etc through media diversity
arrangements at 35 nos of block
section under DNR
Division
CA No. DNR/SnT/Sig/2019/13
Dated: 25.02.2021 |
Sr.
DSTE/DNR/EC
R |
DANAPUR DIVISION-S
AND T /
DNRSnTSig2019-13 /
00900840014641
Dated: 29/01/2020 |
14.09.2022 |
1,81,70,945.37 |
|
32 |
Agra Division: Elimination of
Token less Block Instruments with
block panel in MTJ - PWL 3rd line
& IDH-BXN section of Agra
division. CA No. AGRA-ST-
2018-10 DT 08.08.2018 |
DSTE/AGRA/N
CR |
AGRA/N/WKs/Block
Panels/MTJ-PWL 3rd Line
& IDH - BXN Dt - 24-04-
2018 |
14.03.2022 |
2,07,49,606.56 |
|