Interlocking work of LC No. 55 (JHL-HSR), 66,
99,125 & 126 (DUI-BTI), 27 (BTI-SGNR), 48 &
51(MRNDAADR) in c/w the work of Interlocking
of 10 level crossing gates over Ambala division
having TUVs greater than 20000”. |
NR (LDH) |
NR/S&T/WORKS/LDH/49 DT 03.09.2016 |
22622316.95 |
2 |
Supply installation testing and commissioning of
outdoor signaling gears and associated works for
three stations viz KAMAI ROAD, THINGOU and
KHONGSANG station along with necessary signal
outdoor works and their associated works in
VANGAICHUNGPAO (VNGP) station in
connection with new rail line project Lumding
division of NFR. |
NFR |
NFR-CONST HQ-S AND T /
DYCSTE_C_SCL_2021_05_02 /
00900840043487 Dated |
100121573.64 |
3 |
Ajmer Division: Compliance work of eficiencies
of Signaling System leftover during Doubling work
carried out by RVNL at station KZQ, FA, BRLY,
JWB, MOI, NANA, SRPJ, BMN, MAA, SIM,
SZA, IQG, JTY, KRJD, IBS/KTR & at any station
over Ajmer Division NWR. ( Signalling -Items ) |
NWR(Ajmer) |
LOA No. AJMER DIVISION-S AND T /
SNT-AII-36-2019-
20Re-t / 00900840029321
Dated: 09/12/2020 |
23160688.65 |
4 |
"S&T work for provision of ELECTRICALLY
OPERATED LIFTING BARRIER, DOUBLE
LINE UFSBI BLOCK INSTRUMENT along with
power supply arrangement in c/w doubling between
Roza - Sitapur City section of Moradabad Division
of Northern Railway". |
NR |
CAO-C-NR-S AND T / 178-SIG-CW-32-
97_Pt-1 / 00900840027208
Dated: 17/10/2020 |
29926321.52 |
5 |
Reliability of signalling gears for the equipment
Axle counter, UFSBI etc through media diversity
arrangements at 35 nos of block section under DNR
Division |
ECR |
DANAPUR DIVISION-S AND T /
DNRSnTSig2019-13 / 00900840014641
Dated: 29/01/2020 |
14806826.49 |
6 |
Modification work to suit 25KV
AC traction at 10 station & 4Nos Mid-section
interlocked LC gate incl. Tower wagon siding and
other misc related work in Bhatinda (Excl.)-
Sriganganagar (Incl.) section of Ambala Division
(N.Rly.)of Northern Railway |
Ambala RE | CORE-UMB-S AND T / RE-UMBSNTGR293-
T-95 / 00900840035872
Dated: 24/05/2021 |
49404762.62 |
7 |
S&T work in connection with: (A)
Provision of Dual Detection by means of MSDAC
at BDAG and BDAG-L/C(PB-2019-20 Item
No.545). (B) Provision of Dual Detection by means
of MSDAC at NFK/S & NFK/N of Malda division
(PB-2019-20 Item No.545). (C) Provision of Dual
Detection by means of MSDAC at water logging
prone areas over Malda Division(PB-2019-20 Item
No.545). |
Eastern
Railway
(MALDA) | MALDA DIVISION-S AND T /
MLDT_Sig_20-21_CAP10_OT /
00900840035499
Dated: 12/05/2021 |
66931058.65 |
8 |
KOTA-NAD SECTION: High availability
DIGITAL AXLE COUNTERs (08 Block sections) |
WCR (KOTA) | KOTA/S&T/SIG/2018/17-A
DATED.30.11.2018 |
24681471.83 |
9 |
KOTA-NAD SECTION: High availability
DIGITAL AXLE COUNTERs (11 Block sections) |
WCR (KOTA) | KOTA/S&T/SIG/2018/17-B
DATED.30.11.2018 |
33929404.31 |
10 |
Signalling works in connection with improvement
of Reliability of 11 IBSs in BINA - ITARSI
Section of Bhopal Division. |
WCR (BPL) | BPL/N/WKS/2018-19/SIG/22 DATED
01.02.2019 |
84408149.43 |
11 |
Replacement of Block Instrument by Block Panel
in Jhansi-Banda-Manikpur & Khairar-
Bhimsen section of Jhansi division. |
NCR (JHS) | JHANSI DIVISION-S AND T/JHS-SNTWKS-
2019-01/00900840001617 DATED
31.05.2019 |
57176965.67 |
12 |
Provision of automatic media change over
equipment for BPAC/UFSBI to improve reliability
in different block sections of Samastipur Division |
ECR | SAMASTIPUR DIVISION-S AND T /
ECR_SPJ_ST_T_AC_BPAC_UFSB /
00900840031133 Dated: 20/01/2021 |
16486560.82 |
13 |
Reliability of the signalling gears for the
equipment Axle counter, UFSBI etc through media
diversity arrangement at 44 nos of block sections
under Danapur division |
ECR | Letter No: DANAPUR DIVISION-S AND
T /
DNRSnTSig-2020-14 / 00900840029329
Dated: 09/12/2020 |
13940160.13 |
14 |
“Balance Outdoor and Indoor work for signaling
and Telecommunication in connection with
commissioning of EI at KPI, CNH, PHN, MLS,
LLR, PMN, RPGU & BZM Stations of JHS-BZM
doubling project in Jhansi Division of North
Central Railway in state of U.P., India.” |
RVNL | LOA No. RVNL/PO/JHS-BZM/89/LOA
Dated : 02.01.2021. |
68886021.43 |
15 |
Provision of IBS at 03 Locatio (Todarpur-Anji
Shahabad, Banthara-Tilhar & Bilapur - Tisua)
between Behtagokul-Bareily section of Moradabad
Division” hereinafter called the 'Principal
Agreement |
NR | PROJECT-MB-S AND T/SIG-P-3IBSLKO-
12-19/00900840010988 DATE: -
02.12.2019. |
5,43,58,272 |
16 |
Provision of IBS at 03 Location (Dilawar Nagar-
Rahimabad, Masit-Karna, Kaurah-behtagokul)
between Lucknow-Behatgokul section of
Moradabad Division” hereinafter called the
'Principal Agreement |
NR | PROJECT-MB-S AND T/SIG-P-3IBSLKO-
11-19/00900840011199 DATE: -
05.12.2019 |
5,43,97,233.35 |
17 |
Provision of IBS at 03 Locations (JAT-BBMN,
VJPJ-SMBX & PTKC-KNDI) between JAT-MEX
Section of Ferozpur Division |
NR (LDH) | PROJECT-LDH-S AND T / NR-ST-LDH-
71/ 009008400034095 DATED 03.04.2021 |
64022351.82 |
18 |
Indoor signaling works of addition & alteration in
existing Electronic Interlocking(EI) (Siemens make
Westrace-VLM6) in connection with raising of
sectional speed in the Sultanpur station yard in
Lucknow division of Northern
Railway. |
NR | DYCSTE-C-LKO-S AND T /
287_Sig_C_LKO_T_09_19 /
00900840014967
Dated: 03/02/2020 |
11173695.19 |
19 |
Supply, Designing, Installation, testing and
commissioning of Indoor and Outdoor Signalling
gears in connection with Replacement of
Mechanical Signalling at Two stations Bharuwa
Sumerpur (BSZ) and Ichauli (ICL) with EI (EI
material of Hitachi/Ansaldo make will be supplied
by Railway) in Banda- Bhimsen section of Jhansi
Division of North Central Railway. |
Kanpur
Divison | LOA NO. PROJECT UNIT-CSB-S AND
T/PUCNB-BSZ-ICL-EI-T-
59/00900840053383 DATED:
26.04.2022 |
24041117 |
20 |
Provision of HA-SSDAC in BKN-SDLP, LGHPLCSection
over Bikaner Division |
Bikaner
Division | BIKANER DIVISION-S AND T / SnTBKN-
ET-235 /
00900840061425
Dated: 07/09/2022 |
25198222.24 |
21 |
Provision of HA-SSDAC in BKN-BTI Section
overBikaner Division |
Bikaner
Division | BIKANER DIVISION-S AND T / SnTBKN-
ET-236 /
00900840061201 Dated: 05/09/2022 |
22613377.41 |
22 |
Chithari :- Splitting of longer block section by
converting existing D class station to B class
crossing station. |
Jhansi Division | JHANSI DIVISION-S AND T / JHS-N-W-
17-12 / 00900840062311 Dated 21.09.2022 |
32718911.38 |
23 |
Indoor and out door work in connection with
Replacement of overaged AFTC's in North -East
(KYN-IGP), south - East (KYN-LNL) & Vasai -
Diwa Section of Mumbai Division |
Central
Railway | Letter No: MUMBAI-CST-DIVISION-S
AND T / CR-BB-SNT-NORTH-2021-19 /
00900840039163 Dated: 29/07/2021 |
26166924.11 |
24 |
Supply and execution of signalling works/items in
connection with various track & LHS related works
in ADSTE/BIN & DSTE/GUN Section of Bhopal
Division over WCR(Signalling Works |
WEST
CENTRAL
RLY | Letter No: BHOPAL DIVISION-S AND T /
BPLNWKS2021-22SIG01 /
00900840040918 Dated: 01/09/2021 |
16966906.08 |
25 |
S&T work in connection with construction of LHS
at LC 226, LC 244, LC 253, LC254, LC 279, LC
236, LC 258, LC 294 & LC 289 in ET-JBP section
of JBP division (signalling & Telecom work) and
Provision of maintenance free earthing
arrangement at Stations and Interlocking LC gates
and Telecom installation over Jabalpur
Division.(Telecom work) |
WEST
CENTRAL
RLY | LOA No. JABALPUR DIVISION-S AND
T/ JBP-N-TELE-TENDER-2021-
10/00900840043355 DATED 14.10.2021 |
7205801.99 |
26 |
"S&T work in connection Upgradation/ fitness of
JRBM & SIPC stn of LMG Div for running of
Mail/Exp Trains" |
LMG DIV | LOA No. SNT-10-LMG-2022-23-RT-
1/00900840059597 Dated 05.08.2022 |
1,69,09,164 |