S.No Nature of work Description of work Agreement No. Date Value in Rs.(Lakhs)
1 Panels Signaling arrangements (Panel Interlocking) at RUKMAPUR station in connection with doubling of track between Vikarabad – Tandur section of Secunderabad Division. C/SG/C/36/5/RMT/26/98 22/12/1998 28.87
2 Data Logger Secunderabad & Vijayawada Division:Ballarshah-Vijayawada – Gudur section, monitoring of signaling status by provision of Data Loggers and Networking them from Test Room (Reach-1) – Ballarshah – Kazipet – Vijayawada section. S&T/SC/BPQ-KZJ-BZA/DL/9/2001 21/09/2001 28.87
3 Data Logger Secunderabad & Vijayawada Division: Ballarshah – Vijayawada – Gudur section,monitoring of signaling status by provision of Data Loggers and Networking them from Test Room (Reach-II) – Vijayawada – Gudur section S&T/BZA/BZA-GDR/DL/10/2001 1/11/2001 77.47
4 Panel Signaling works (1) at Lingampalli station (2) Auto signaling works between LPI-HFZ section, (3) Re-location of S&T Gears for progression of Engineering Works between LPI-HFZ section of Secunderabad division in connection with MMTS projects. C/SG/C/36/5/LPI-HFZ/62/01 6/3/2002 62.83
5 Data Logger Installation, Testing and Commissioning of Data Loggers at Moula Ali ABC &Lallaguda cabins duly connecting net working with existing Data Logger (11 Nos) on SC – KZJ Sections. C/SG/36/289 26/07/2002 2.23
6 OFC and Quad Supply and laying of Optical Fibre Cable along with 4 quad telecom cable, splicing & testing of OFC and commissioning of 4 quad telecom system including DTMF control telephones, emergency sockets etc, on Guntakal – Hubli section (Reach – IV: Harlapur – Hubli section). S&T/MW/P/GTL-UBL/OF/6/2002 22/08/2002 215.88
7 Panel Repairs to Relay wiring at WIRUR and MAKUDI stations on STE/BPA C/SG/36/290 17/09/2002 8.04
8 Data Logger Jointing, Terminating, Testing & Commissioning of under ground 4 quad Telecom. Cable system, for providing L.C. Gate communication EC. C/SG/36/294 21/11/2002 23.8
9 Panel Replacement of signaling gears with centralized operation of points and signals at Parhani station of Hyderabad division of South Central Railway. C/SG/C/36/5/200 2/12/2002 44.03
10 Data Logger Secunderabad & Vijayawada Division: Ballarshah – Vijayawada – Gudur section,monitoring of signaling status by provision of Data Loggers and Networking them from Test Room (Reach-II) – Vijayawada – Gudur section C/SG/C/36/5/210 7/5/2003 189.12
11 Panel Signaling portion of work at HSJ, HYB, KOD, SNF A & B Cabins, HFZ & PI stations, HYB – VKB Section. S&T/BZA/BZA-GDR/DL/10/2001 30/05/2003 24.64
12 SSDAC BZA-RJY: Block proving by axle counters (18 double line and 4 single line sections) on Vijayawada Division of South Central Railway. S&T/P/ACBP.1/2003 24/06/2003 255.65
13 LED Signals Provision of token less block instruments on BGM-SUL, PCH-CKR, RBH-KUD & UGR-MRJ section of Hubli Division. H/SG.122/1/23/AGT.103 25/07/2003 6.37
14 LED Signals Panel interlocking work at Bellary (Phase work), Bellary cantonment, Kuditini, Daroji and Tornagallu (Phase work) in connection with doubling of track between Bellary – Tornagallu section. G/SG/CN/T/31/BAY-TNGL 28/11/2003 113.03
15 Data Logger Provision of Automatic Train Control charting system for the control Board No.3,4& 5 on Secunderabad Division. C/SG/36/319 18/01/2004 29.36