1 |
Panels |
Signaling arrangements (Panel Interlocking) at RUKMAPUR station in connection with doubling of track between Vikarabad – Tandur section of Secunderabad Division. |
C/SG/C/36/5/RMT/26/98 |
22/12/1998 |
28.87 |
2 |
Data Logger |
Secunderabad & Vijayawada Division:Ballarshah-Vijayawada – Gudur section, monitoring of signaling status by provision of Data Loggers and Networking them from Test Room (Reach-1) – Ballarshah – Kazipet – Vijayawada section. |
S&T/SC/BPQ-KZJ-BZA/DL/9/2001 |
21/09/2001 |
28.87 |
3 |
Data Logger |
Secunderabad & Vijayawada Division: Ballarshah – Vijayawada – Gudur section,monitoring of signaling status by provision of Data Loggers and Networking them from Test Room (Reach-II) – Vijayawada – Gudur section |
S&T/BZA/BZA-GDR/DL/10/2001 |
1/11/2001 |
77.47 |
4 |
Panel |
Signaling works (1) at Lingampalli station (2) Auto signaling works between LPI-HFZ section, (3) Re-location of S&T Gears for progression of Engineering Works between LPI-HFZ section of Secunderabad division in connection with MMTS projects. |
C/SG/C/36/5/LPI-HFZ/62/01 |
6/3/2002 |
62.83 |
5 |
Data Logger |
Installation, Testing and Commissioning of Data Loggers at Moula Ali ABC &Lallaguda cabins duly connecting net working with existing Data Logger (11 Nos) on SC – KZJ Sections. |
C/SG/36/289 |
26/07/2002 |
2.23 |
6 |
OFC and Quad |
Supply and laying of Optical Fibre Cable along with 4 quad telecom cable, splicing & testing of OFC and commissioning of 4 quad telecom system including DTMF control telephones, emergency sockets etc, on Guntakal – Hubli section (Reach – IV: Harlapur – Hubli section). |
S&T/MW/P/GTL-UBL/OF/6/2002 |
22/08/2002 |
215.88 |
7 |
Panel |
Repairs to Relay wiring at WIRUR and MAKUDI stations on STE/BPA |
C/SG/36/290 |
17/09/2002 |
8.04 |
8 |
Data Logger |
Jointing, Terminating, Testing & Commissioning of under ground 4 quad Telecom. Cable system, for providing L.C. Gate communication EC. |
C/SG/36/294 |
21/11/2002 |
23.8 |
9 |
Panel |
Replacement of signaling gears with centralized operation of points and signals at Parhani station of Hyderabad division of South Central Railway. |
C/SG/C/36/5/200 |
2/12/2002 |
44.03 |
10 |
Data Logger |
Secunderabad & Vijayawada Division: Ballarshah – Vijayawada – Gudur section,monitoring of signaling status by provision of Data Loggers and Networking them from Test Room (Reach-II) – Vijayawada – Gudur section |
C/SG/C/36/5/210 |
7/5/2003 |
189.12 |
11 |
Panel |
Signaling portion of work at HSJ, HYB, KOD, SNF A & B Cabins, HFZ & PI stations, HYB – VKB Section. |
S&T/BZA/BZA-GDR/DL/10/2001 |
30/05/2003 |
24.64 |
12 |
SSDAC |
BZA-RJY: Block proving by axle counters (18 double line and 4 single line sections) on Vijayawada Division of South Central Railway. |
S&T/P/ACBP.1/2003 |
24/06/2003 |
255.65 |
13 |
LED Signals |
Provision of token less block instruments on BGM-SUL, PCH-CKR, RBH-KUD & UGR-MRJ section of Hubli Division. |
H/SG.122/1/23/AGT.103 |
25/07/2003 |
6.37 |
14 |
LED Signals |
Panel interlocking work at Bellary (Phase work), Bellary cantonment, Kuditini, Daroji and Tornagallu (Phase work) in connection with doubling of track between Bellary – Tornagallu section. |
G/SG/CN/T/31/BAY-TNGL |
28/11/2003 |
113.03 |
15 |
Data Logger |
Provision of Automatic Train Control charting system for the control Board No.3,4& 5 on Secunderabad Division. |
C/SG/36/319 |
18/01/2004 |
29.36 |